Location: Northwest Scotland
Completed: 2021
Architect: Blueprint Architecture
Engineers: SF Structures
Glazing Specialists: Trombe
Materials: Partially kiln dried Douglas fir, concealed steel connections
Features: Client's request for no diagonal bracing and lack of horizontal timber ties internally required clever use of concealed steel flitch plates and connections
As part of a complete renovation of three old school buildings into a habitable and functional family home, this client’s architects, Blueprint Architecture, included a glazed extension in the plans.
We had worked with the design team on a previous collaboration, so they approached us to provide the timber frame for this incredible addition.
Read more
We'll keep you up to date about events and send you exclusive invites to our open house events
"*" indicates required fields
Your email address is safe with us. Read our privacy policy.