Location: Northwest Scotland
Completed: 2021
Architect: Blueprint Architecture
Engineers: SF Structures
Glazing Specialists: Trombe
Materials: Partially kiln dried Douglas fir, concealed steel connections
Features: Client's request for no diagonal bracing and lack of horizontal timber ties internally required clever use of concealed steel flitch plates and connections
As part of a complete renovation of three old school buildings into a habitable and functional family home, this client’s architects, Blueprint Architecture, included a glazed extension in the plans.
We had worked with the design team on a previous collaboration, so they approached us to provide the timber frame for this incredible addition.
Read more
"*" indicates required fields
"*" indicates required fields
If you want to give us more detailed information, visit the main contact form.
"*" indicates required fields
We'll keep you up to date about events and send you exclusive invites to our open house events
"*" indicates required fields
Your email address is safe with us. Read our privacy policy.